Required Documents
-
The required documents, drawings, engineering drawings and a proof of the project shall be submitted to the electronic system for follow-up by the Director General, The application shall then be transferred to the Classification Section to inspect the site
-
Then a letter (initial approval for the building / conversion of an existing building) is issued for the hotel, A visit is made by the classification section periodically and its fees are collected., When the completion rate of the building is 90%, a final classification is made to determine the category and then the initial approval is issued, approved by the required government agencies.
-
the collection of license fees and finally issuing the hotel license., • Tourism Registry Hotels, Resorts and Hostel 5 Stars – AED 1000 4 Stars – AED 1000 3 Stars – AED 900 2 Stars – AED 800 1 Stars – AED 700